Filanovsky topsides work starts

Published

Astrakhan’s Krasnye Barrikady shipyard has started constructing the living quarter platform (LQP-2) for the second stage of Vladimir Filanovsky field developed by LUKOIL in the Russian sector of the Caspian Sea.

The shipyard will construct two bearing blocks, the topside of the LQP and a catwalk bridge to connect the LQP-2 and the ice-resistant platform (IRP-2).

The LQP-2 will accommodate 55 people and include a helicopter pad.The LQP-2 is to be commissioned in the autumn of 2016.

Current News

U.S. Oil Production Still has Growth Potential

U.S. Oil Production Still has

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

Dajin Forms Offshore Wind Alli

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

EnerMech Hires Former SLB Exec

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Eni Expands Asian Footprint wi

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine