Noble rig stabilized after tilt

Published

Noble Corp.’s drilling rig, Noble Paul Wolff (pictured), experienced a “ballast control incident” off Brazil at 1 a.m. local time, the company reported 28 Feb 2014. The rig’s crew has secured the well, and Noble said that measures are underway to resolve the matter.

The rig is operated by Petrobras, and was located in the Campos basin off the coast of Rio de Janeiro at the SS-53 Noble Paul Wolff platform when the incident occurred.

"The incident occurred due to flooding in one of the tanks of the vessel, caused by failure of the ballast system, which controls the stability of the valve unit," a Petrobras spokesman said in an emailed statement to Reuters.

Noble Corp. said that 77 non-essential personnel were evacuated from the rig with no reported injuries, and no pollution has been detected.

Noble Paul Wolff was built in 1980, and upgraded in 2006; the rig houses a maximum crew of 125.

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Precision Shaft Alignment: A S

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine