Statoil to drill at Snøhvit with Songa Enabler

Norway's Petroleum Safety Authority (PSA) has granted Statoil consent to drill a fourth well at Snøhvit with the Songa Enabler semisubmersible vessel in the Barents Sea. 

The Songa Enabler. Image from Songa Offshore.

Snøhvit is a gas field in the Barents Sea northwest of Hammerfest. Snøhvit has been developed using a subsea production facility. The gas is transported onshore through a 143km pipeline to Melkøya, off Hammerfest. Production at Snøhvit began in 2007.

On 15 July 2016, Statoil received consent to use the Songa Enabler mobile drilling facility to drill three wells on the field.

"We have now given Statoil consent to drill a fourth well using the same facility," the PSA said.

The well template is in 318m of water.

Drilling is scheduled to begin in mid-march 2017 and will last 65 days.

Read more:

Statoil expands Snøhvit CO2 and gas production

 

Statoil readies for Snøhvit drilling

Current News

Sapura Energy Lands $1.8B Petrobras Deal for Six Pipelaying Vessels and Subsea Services

Sapura Energy Lands $1.8B Petr

Saudi Aramco Profit Falls Amid Lower Oil Prices and Volumes Sold

Saudi Aramco Profit Falls Amid

TGS Launches Multi-Client Wind and Metocean Surveys Off Germany

TGS Launches Multi-Client Wind

Escalated Middle East Conflict Could Hike Oil Price to $150/barrel, Bloomberg Finds

Escalated Middle East Conflict

Subscribe for OE Digital E‑News

Offshore Engineer Magazine