Statoil to drill at Snøhvit with Songa Enabler

Published

Norway's Petroleum Safety Authority (PSA) has granted Statoil consent to drill a fourth well at Snøhvit with the Songa Enabler semisubmersible vessel in the Barents Sea. 

The Songa Enabler. Image from Songa Offshore.

Snøhvit is a gas field in the Barents Sea northwest of Hammerfest. Snøhvit has been developed using a subsea production facility. The gas is transported onshore through a 143km pipeline to Melkøya, off Hammerfest. Production at Snøhvit began in 2007.

On 15 July 2016, Statoil received consent to use the Songa Enabler mobile drilling facility to drill three wells on the field.

"We have now given Statoil consent to drill a fourth well using the same facility," the PSA said.

The well template is in 318m of water.

Drilling is scheduled to begin in mid-march 2017 and will last 65 days.

Read more:

Statoil expands Snøhvit CO2 and gas production

 

Statoil readies for Snøhvit drilling

Current News

Suriname's Block 52 Could Become Commercial in 18 Months

Suriname's Block 52 Could Beco

Bourbon Wins Prime Energy Contract in Philippines

Bourbon Wins Prime Energy Cont

TDI-Brooks Survey Vessel Gyre Arrives in Liberia

TDI-Brooks Survey Vessel Gyre

CRP Subsea Secures Cable Protection Contract for Offshore Wind

CRP Subsea Secures Cable Prote

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine