White Rose work goes to TechnipFMC

Published

TechnipFMC has been awarded an engineering, procurement, construction and installation (EPCI) contract from Husky Energy for the West White Rose Project in Eastern Canada.

The contract covers the supply and installation of subsea equipment including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose floating production, storage and offloading (FPSO) vessel.

The Husky West White Rose Project will use a fixed platform tied back to the SeaRose FPSO vessel. The main White Rose field is about 350km (217mi) east of St. John’s, Newfoundland and Labrador, on the eastern edge of the Jeanne d’Arc Basin in water depths of about 120m (393ft).

 

Current News

Onshore Cable Installation at Maasvlakte for Offshore Wind Enter Final Phase

Onshore Cable Installation at

Sonardyne Begins Seabed Monitoring for Offshore CCS Project

Sonardyne Begins Seabed Monito

HPR Secures Taiwan Offshore Wind Deal After High-Current ROV Trials

HPR Secures Taiwan Offshore Wi

BP Takes Operatorship of Three Namibia’s Offshore Licenses in Eco Farm-Down

BP Takes Operatorship of Three

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine