White Rose work goes to TechnipFMC

TechnipFMC has been awarded an engineering, procurement, construction and installation (EPCI) contract from Husky Energy for the West White Rose Project in Eastern Canada.

The contract covers the supply and installation of subsea equipment including tie-in manifolds, flexible flowlines, and control umbilicals, which will connect the recently announced West White Rose platform to the existing SeaRose floating production, storage and offloading (FPSO) vessel.

The Husky West White Rose Project will use a fixed platform tied back to the SeaRose FPSO vessel. The main White Rose field is about 350km (217mi) east of St. John’s, Newfoundland and Labrador, on the eastern edge of the Jeanne d’Arc Basin in water depths of about 120m (393ft).

 

Current News

Gibdock Wraps Up Refurbishment of TechnipFMC's Deepwater Pipelayer

Gibdock Wraps Up Refurbishment

Portuguese Firm Bags $280M for Maintenance Work on Petrobras' Platforms

Portuguese Firm Bags $280M for

Galp Targets 40% Oil Production Boost in Brazil with New Field

Galp Targets 40% Oil Productio

Eni Starts Talks with GIP for Carbon Capture Unit Stake Sale

Eni Starts Talks with GIP for

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine