Western Isles FPSO on stream

Dana Petroleum's long delayed Western Isles development has produced first oil, it's been reported. 

The UK North Sea development has been brough on stream using a new-build Sevan-design cylindical floating production unit (FPSO) built at COSCO's yard in China. 

It is to produce from the Korea-owned Dana Petroleum's Harris and Barra fields in the northern UK North Sea, 160km east of Shetland in 165m water depth. 

The two fields contain an estimated 45 MMboe recoverable. Plateau production is expected to be around 40,000 boe/d, with a field life of 15 years. 

The development comprises five production wells and four water injection wells, via two eight-slot subsea production manifolds and associated flowlines. Up to three additional exploration wells are also planned. 

The Western Isles development was approved by the authorities in 2012, with first oil then planned for 2015.

Current News

Namibia Targets First Oil Production from Venus Field in 2029/2030

Namibia Targets First Oil Prod

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Second HVDC Platform Installed

CBED Signs Up Siemens Gamesa for Wind Creation SOV’s First Job

CBED Signs Up Siemens Gamesa f

Deal in Place for 1GW+ Offshore Wind Farm in Southeast Australia

Deal in Place for 1GW+ Offshor

Subscribe for OE Digital E‑News

Offshore Engineer Magazine