Fjords Processing News

 

Well-modeling process optimizes production strategies

Aug 04, 2015

LR Senergy’s new process uses computational fluid dynamics (CFD) to model a well and near wellbore — and subsequently identify production optimization options and strategies. Jeannie Stell reports. Michael Byrne…

Drilling slump "worse than 2008-9"

Jul 16, 2015

The drilling market is turning out to be worse than in 2008-9 and is expected to continue into 2016 and beyond, says Norway’s Akastor as it feels the brunt of the low-oil price driven down turn.  The former Aker Solutions company is planning…

Baker Hughes inks Johan Sverdrup drilling gig

Jul 06, 2015

Baker Hughes has picked up the US$190 million (NOK1.5 billion) onshore contract for integrated drilling services on the massive Johan Sverdrup field offshore Norway. Baker Hughes joins Norway's Odfjell, which was awarded two contracts…

Ex-Aker firm grabs Johan Sverdrup contracts

Jul 03, 2015

Norway-based Fjords Processing has won three contracts for the deliveries of process systems for the Johan Sverdrup development in the North Sea. The contracts were signed with Statoil on behalf of the Johan Sverdrup license. The scope…

Goliat in final preparations

Jun 18, 2015

Final preparation of the Goliat platform is well under way in the Barents Sea. Goliat. From Eni. With more than 600 people now working offshore at the Goliat field, activity levels…

Dana to utilize Asset Guardian software

May 18, 2015

Dana Petroleum awarded Asset Guardian Solutions (AGSL) a contract to implement and support Asset Guardian, a software system that helps secure the integrity of process software. Asset Guardian will be installed by AGSL on Dana’s Triton FPSO in the UK North Sea…

Goliat in tow to Barents

May 07, 2015

Eni's Goliat platform is being towed from Hammerfest in Finnmark to the field location in the Barents Sea.   Goliat tow out. From Eni. The cylindrical platform – a so-called floating…

Taking the load

May 01, 2015

Calibrating the 64 load cells on the Snorre A tension leg platform was a lengthy arduous task, until a new solution, installed late 2014, was found. Elaine Maslin reports. The Snorre A tension leg platform…

Goliat arriving in Hammerfest

Apr 28, 2015

In this video, Eni shows the Goliat floating and production storage offloading unit (FPSO) platform arriving in Hammerfest, Norway from the Ulsan shipyard in South Korea after a 63-day journey of 15,608 nautical miles. The platform was aboard the Dockwise Vanguard…

Goliat platform floats off

Apr 23, 2015

The Goliat floating production storage and offloading unit (FPSO) floated off the Dockwise Vanguard in the fjord outside Hammerfest on 23 April. Goliat. From Eni. Eni says the platform will now be temporarily moored in Ersvika…

Goliat arrives in Hammerfest

Apr 17, 2015

Eni's floating cylindrical platform for the Goliat field in the Barents Sea arrives in Hammerfest today (April 17) from South Korea after a 63-day voyage covering 15,608 nautical miles, the firm has announced. The 107m-diameter, 64,000…

Aker, Fjord form WellSep alliance

Apr 13, 2015

Aker Solutions and Fjords Processing have formed WellSep, an alliance to develop technology and capabilities for advanced wellstream separation and treatment solutions for the subsea and topside oil and gas industry. The alliance…

McDermott completes Pemex compression module

Jan 07, 2015

McDermott International's Chinese joint venture Qingdao McDermott Wuchuan Offshore Engineering (QMW) completed a fast-track compression process module fabrication subcontract for Jord Oil & Gas Systems. The company is the prime contractor…

Refinery records mean safety first

Oct 10, 2014

Refinery safety remains paramount as production continues its upward swing as equipment and people end up pressed to increase a facility’s capabilities. It is no secret with new technologies for fracking and drilling that are giving a…

Golden Eagle PUQ deck installation

Sep 16, 2014

Watch as Nexen’s video gives insight into the four-day operation needed to lift and install the production, utilities and quarters (PUQ) deck for the Golden Eagle area development offshore, approximatley 70km northeast of Aberdeen…

Current News

Seequent Receives Sustainable Exhibitor Award at Global Offshore Wind 2025

Seequent Receives Sustainable

Libya Blocks Greek Tender for Hydrocarbon Exploration Off Crete

Libya Blocks Greek Tender for

Russia Looks to Myanmar Offshore Oil and Gas Prospects

Russia Looks to Myanmar Offsho

TotalEnergies’ Offshore Platform Workers in UK Secure Better Conditions

TotalEnergies’ Offshore Platfo

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine