Lamprell delivers NDC Al Gharbia jackup

Published

Lamprell completed the construction on the jackup drilling rig, Al Gharbia, and its delivery to Abu Dhabi’s National Drilling Co. (NDC).

Completion and delivery of the jackup rig, on time and on budget, was marked at an inauguration ceremony held at Lamprell’s Hamriyah facility in the UAE on 22 December. The rig will depart the facility in late December en route to its drilling location in Abu Dhabi.

The contract for the NDC Al Gharbia rig was signed in November 2014 and this is the seventh rig in a series of nine rigs being built and delivered by Lamprell to NDC. All nine rigs have been designed according to the Cameron LeTourneau Super 116E (Enhanced) Class design. The remaining two rigs are proceeding on schedule and will be delivered as planned in 2017.

“NDC launched this strategic project to maintain the highest levels of reliability and resilience, as well as to ensure that we provide high quality, cost-efficient, and versatile drilling services to our clients, ADNOC Group companies, without compromising on HSE standards and asset integrity,” said Abdalla Saeed Al Suwaidi, CEO, NDC.

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine