PEMEX picks GE wellheads

Published

GE Oil & Gas announced today it will provide vital surface equipment to Mexico’s national oil company PEMEX Exploration and Production for use at its offshore project in the Ayatsil heavy oil field located in the Campeche Sound, in the Gulf of Mexico.

The multi-year contract includes the installation of GE’s surface wellheads and trees in new wells that will be drilled by PEMEX through the duration of the contract. PEMEX is focused on strengthening oil extraction in the Marine Zone, an area located within territorial waters near the coasts of Campeche, Yucatan and Quintana Roo. PEMEX considers Ayatsil to be one of the fields that will help the company recover the historic production of the zone and continue to increase it in the coming years.

GE’s surface wellheads and trees will be manufactured at the company’s Ecatepec plant in Mexico City, which has been equipped with new high-end manufacturing equipment. Employees at the plant have received the required training to handle this type of advanced technology.

While the Ayatsil offshore project is GE’s largest contract currently underway in the Marine Zone, the company is also working with PEMEX on several other important initiatives. GE recently announced it is teaming up with PEMEX and the Mexico Institute of Petroleum to research and develop technologies to help improve productivity and efficiency in mature fields, develop deep and ultra-deep water projects, and modernize Mexico’s energy infrastructure.

Current News

AF Offshore Secures North Sea Decom Job

AF Offshore Secures North Sea

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Island Offshore’s Hybrid OECV

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Jumbo Offshore Wraps Up Errea

Petronas Takes Operatorship of Oman’s Offshore Block 18

Petronas Takes Operatorship of

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine