Huisman Building Drilling System for CMHI

Published

Photo: Huisman Equipment BV
Photo: Huisman Equipment BV

This week, China Merchants Heavy Industries (CMHI) awarded Huisman a contract for the engineering and fabrication of a drilling system which will be integrated and installed on the moored drilling semi-submersible constructed at CMHI Haimen.

This drilling system will be used for oil and gas drilling activities in shallow to medium water depths all around Asia, particularly the South China Sea.

The contract is a result of a constructive cooperation between CMHI and Huisman during the semi’s concept design. The drilling system comprises an 1800kips static rated load Dual Multi Purpose Drilling Tower (DMPT), a single pipe setback drum,  innovative manipulator arms for pipe and tool handling, top drive, iron roughnecks, skid carts, catwalk machines, gantry and deck cranes, drillers cabins and Huisman’s fully integrated control system.

The Dual Multi Purpose Tower (DMPT) will be delivered in the second quarter of 2020 to CMHI Jiangsu Yard in China. Fabrication and final commissioning of the completed DMPT will take place at Huisman China.

Current News

TGS Embarks on Multi-Client 2D Survey off Angola

TGS Embarks on Multi-Client 2D

Orbital Marine Grows UK and Canada Tidal Energy Orderbook to 32MW

Orbital Marine Grows UK and Ca

SIT, Seatrium Launch Offshore and Marine Digital Learning Lab

SIT, Seatrium Launch Offshore

Elemental Energies Expands Subsurface Expertise with APT Buy

Elemental Energies Expands Sub

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine