Reflex Marine gets Brazil nod

Published

Reflex Marine has become the first European company to have its technology certified by the Brazilian Navy, the accredited body for offshore safety in the region.

The certification relates to the company’s FROG-6 (pictured) device and comes off the back of rigorous testing to scrutinize its capabilities.  

Carol Richards, Reflex Marine’s regional sales manager for South America said in a statement: “In recent years we have been working with a number of operators in Brazil to identify improvements that could be made in safety during crew transfer operations.

In December Reflex Marine welcomed personnel from the coastguard section of the Brazilian Navy to Aberdeen to witness the testing of the FROG-6 first hand. Representatives from the Directorate of Ports and Coasts explored Reflex Marine’s industry leading FROG capsule and witnessed immersion, load, vertical and lateral impact tests.

The national oil operator for Brazil, Petrobras is one operator currently reviewing its method of crane transfer and is looking at adopting the FROG-6 for its personnel transfer requirements.

The FROG-6 provides the perfect solution as substantially increased transfer rates coupled with MedEvac capabilities, mean the device is both versatile and robust and offers clients safety, value and cost-efficiency.

The FROG-6 provides extensive protection from the four key risks of transfer including falling, collision, heavy landings and immersion. The buoyancy panels provides self-righting and floatation which protects passengers in the unlikely event of immersion in water. These buoyancy panels are coupled with a stainless steel frame to protect passengers from side impacts.

The seats are mounted on coil springs which are combined with gas dampers to protect passengers from vertical impacts and heavy landings. The polymer foam shock absorbing landing feet also help to reduce vertical impacts.

The device utilizes quick release three-point harnesses which provide passenger safety, comfort, rapid egress and provides additional protection from falling. Additionally, secondary backup lifting assembly is provided to provide lifting redundancy.

Current News

Pipelay Vessel Ready for UK Carbon Storage Project

Pipelay Vessel Ready for UK Ca

Nadara Confirms Landfall Location for Bellrock Floating Wind Project

Nadara Confirms Landfall Locat

Shell Acquires Stake in BP's Conifer Prospect in the Gulf of Mexico

Shell Acquires Stake in BP's C

Chevron, ENI, Geopark Signs Energy Agreements in Venezuela

Chevron, ENI, Geopark Signs En

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine