Production News


Second Gazprom Prirazlomnoye well onstream

Aug 21, 2015

After nearly two years, Gazprom Neft Shelf has brought its second well into production at the Prirazlomnoye field in the Russian Arctic. Image of the Prirazlomnaya field. From Gazprom. Prirazlomnoye is located in the Pechora Sea…

PPE seals installed on failsafe systems

Aug 19, 2015

Precision Polymer Engineering (PPE), a manufacturer of molded elastomer seals, has announced that SECC Oil and Gas, a supplier of couplings and connectors to the oil and gas industry, has installed its Perlast G75LT and G90LT O-rings in a…

Wassana achieves first oil

Aug 17, 2015

First oil has commenced from the Wassana oil field in the G10/48 concession in the Gulf of Thailand, operator KrisEnergy announced. Wassana is expected to achieve peak production of approximately 10,000 bo/d by year’s end. KrisEnergy…

Trendsetter completes containment project

Aug 12, 2015

Trendsetter Engineering has completed work on a containment toolkit that can be deployed to minimize the environmental impact of a subsea well incident. This follows their delivery of four subsea well capping stacks, designed to shut in an uncontrolled subsea well…

First Subsea completes Goliat installation

Aug 12, 2015

Subsea connector specialist First Subsea, has successfully completed the installation of bend stiffener connections for gas lift and production risers, power cables and umbilicals, for the Goliat FPSO. Operated by ENI Norge, the…

KPMG: decom activity creates opportunities

Aug 11, 2015

Oil and gas operators will have to approach the challenge of decommissioning in new ways if the goal of maximizing economic recovery from the UK Continental Shelf (UKCS) is to be achieved, according to a report from professional services firm KPMG…

Shell, Esso sell Anasuria Cluster stake

Aug 06, 2015

Shell along with partner Esso Exploration agreed to sell their entire stakes (50-50) in the Anasuria Cluster in the UK Central North Sea to a Malaysian joint venture consisting of Ping Petroleum and Hibiscus Petroleum. News reports put the sale price at US$105 million…

Well-modeling process optimizes production strategies

Aug 04, 2015

LR Senergy’s new process uses computational fluid dynamics (CFD) to model a well and near wellbore — and subsequently identify production optimization options and strategies. Jeannie Stell reports. Michael Byrne…

North Sea production rises for first time in 15 years

Aug 04, 2015

North Sea production could finally reverse its 15-year downward trend this year as new fields come onstream and production efficiency measures take hold.  According to the Department of Energy and Climate Change provisional 2015 production figures…

Two for one

Aug 01, 2015

When developing the Lucius and Heidelberg fields in the deepwater Gulf of Mexico, Anadarko Petroleum opted for a “design one, build two” strategy. Audrey Leon reports on how the Lucius field, which began production in January, came to be…

Trelleborg to launch sealing solutions website

Jul 31, 2015

Trelleborg Sealing Solutions is launching a new online resource for engineers at an international conference next month as part of its “commitment” to the oil and gas industry. The website – ‘oilandgas-seals.com’ provides a comprehensive…

Yolla-6 online at BassGas

Jul 30, 2015

The Yolla-6 development well at the BassGas project offshore Australia has been successfully tied-in to export facilities on the Yolla platform and production from that well has commenced, according to partner AWE Ltd. Image from Origin…

FCI releases new flow meter

Jul 29, 2015

Fluid Components International’s (FCI) new model ST100L air/gas in-line thermal mass flow meter features an all-welded, no-thread flow element connection to provide flow measurement in demanding high-pressure industrial operating environments…

Borets completes PMM-PCP trial

Jul 27, 2015

Borets, a provider for the engineering, manufacturing, sales and service of electric submersible pump (ESP) systems, has successfully conducted a North American field trial of its PMM-PCP system, the first permanent magnet motor (PMM) running…

Tendeka, Eternal Asia sign two-year AICD agreement

Jul 24, 2015

Tendeka, a provider of completions systems and services to the upstream oil and gas industry, has signed a two-year agreement with Eternal Asia Supply Chain Management for the exclusive supply of its FloSure autonomous inflow control devices (AICDs) in China…

Current News

Talos Energy Makes Leadership Team Changes

SOVs – Analyzing Current, Future Demand Drivers

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Skanska Set for South Brooklyn Marine Terminal Buildout

Subscribe for OE Digital E‑News