Latest News - page 2884

 

Big bore boosts Angel production

Jun 10, 2010

In October 2008, 37 years after its discovery, the Angel field began producing to a not-normally manned platform. In the ensuing 18 months, this platform offshore Western Australia has seen 98% uptime. Jennifer Pallanich discusses the A$1.6…

Designing for depth

Jun 10, 2010

If all goes as planned, Seattle, Washington-based Principle Power and Energias de Portugal will deploy a prototype deepwater wind turbine in the Atlantic next year. Russell McCulley talks to Principle Power CEO Alla Weinstein about the company's WindFloat design…

Let the 'eagles' soar

Jun 10, 2010

Knowledge management is key if the offshore oil and gas industry wishes to remain healthy, survive, and endure upcoming challenges, says Pyrodyne’s Randy Smith. In his opener to this month’s recruitment & training review, he explains why KM…

Intelligence gathering

Jun 10, 2010

The digital oilfield has become mainstream and is how business is now conducted. That was the message at the third SPE Intelligent Energy conference convened in The Netherlands this spring with over 1500 attendees including a high proportion of business leaders…

Well intervention units in a class of their own

May 20, 2010

Rapid technological and market developments in the offshore industry over the past five years have put pressure on class to develop rules and notations for a new generation of specialised well-intervention offshore vessels. DNV's Alexander Wardwell reports…

Kinks in the pre-salt supply chain

May 20, 2010

While operating in Brazil’s pre-salt region does require an array of technologies, Petrobras CEO Jose Gabrielli told a Houston lunch that a bigger challenge lies in meeting logistical demands for operating in deep waters offshore. During the Brazil-Texas Chamber of Commerce event in March…

Products in review / May 2010 OE

May 20, 2010

Improving data integrationLandmark has developed a new integrated, asset-level production operations and optimization workflow solutions program called DecisionSpace for Production. The software is deployed in several deepwater FPSO environments…

Nigeria closes in on oil reforms

May 20, 2010

Nigeria’s controversial oil reforms, long in the works, appear close to passage. The government hopes to shore up falling production and get a bigger share of oil profits. But IOCs doing business in the Delta are wary, as Russell McCulley reports…

Scandinavia Review

May 20, 2010

Handling the loadCargotec is to deliver MacGregor offshore and subsea load-handling systems to a deepsea research vessel on order at Mitsubishi Heavy Industries’ Shimonoseki shipyard in Japan.‘This contract highlights Cargotec’s capacity and technological expertise in offshore load-handling…

Driving systemic change

May 20, 2010

‘It seems the world is feeling better,’ observed Talisman Energy president and CEO John Manzoni, striking an optimistic note in his keynote speech at the recent IP dinner in London. But, he wondered, is the oil & gas industry ready to drive…

Heavy losses in Horizon tragedy

May 20, 2010

Late in the evening 20 April, an explosion rocked the deck of the Deepwater Horizon and set off a fire that raged for 36 hours before the Transocean semisubmersible plunged to the seafloor 5000ft below. As OE went to press, operator BP and other…

Sizing up the seismic options

May 20, 2010

Operating in the marine seismic environment requires the ability to constantly adapt and chase down the opportunities. Andrew McBarnet describes how fortunes tend to favour the big rather than the brave.It’s business as usual’ has got to be something of a misnomer in commercial life…

Could water worries scupper shale gas?

May 20, 2010

Water shortages could pose as great a threat to energy security as political instability or terrorism, leading peak oil theorist Matt Simmons told delegates at the Global Marine Renewable Energy Conference in Seattle, Washington, last month…

Virginia sale to test Atlantic interest

May 20, 2010

The scheduled 2012 lease sale offshore Virginia will proceed, even without the environmental impact studies necessary to allow oil & gas exploration in place, according to MMS director Liz Burnham.The sale – the first on the US Atlantic OCS…

Time under the microscope

May 20, 2010

Non-productive time (NPT) associated with control systems software and hardware integration remains a significant drain on high-spec offshore asset costs, according to a study released last month.The study, by the Athens Group and ModuSpec,…

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Two DOF Vessels Get Work in North Sea and Australia

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Subscribe for OE Digital E‑News