Eco Wave Power Concludes Operational Testing of US Pilot Wave Plant

Thursday, August 28, 2025

Eco Wave Power has completed operational testing at its U.S. pilot wave energy project at the Port of Los Angeles.

The operational testing marked the lowering of its floaters into the water for the very first time.

The milestone follows the finalization of all installation works at the project site, including full installation of all wave energy floaters, connection of hydraulic pipes and supporting infrastructure, and placement of the onshore energy conversion unit.

With installation completed, Eco Wave Power has now officially entered the operational phase of its U.S. journey.

"Seeing our floaters lowered into the water for the first time, and having it shared live on Good Morning America, is a moment of great pride, not only for Eco Wave Power but for the future of clean energy innovation

"This pilot station is a vital step in demonstrating how wave energy can be harnessed using existing marine infrastructure, while laying the groundwork for full-scale commercialization in the United States,” said Inna Braverman, Founder and CEO of Eco Wave Power.

The Los Angeles project is designed as a demonstration station, with the objective to showcase Eco Wave Power's patented onshore technology in U.S. marine conditions, and establish a foundation for future grid-connected commercial wave energy projects in the country.

Categories: Technology Offshore Energy Renewable Energy Industry News Activity North America Wave Energy

Related Stories

Kongsberg Maritime Secures LARS Contract with Sea1 Offshore

Ørsted’s Largest German Offshore Wind Farm Produces First Power

Vestas Books 660MW Offshore Wind Turbine Order

Current News

U.S. Oil Production Still has Growth Potential

Dajin Forms Offshore Wind Alliance with German Port Terminal Operator

EnerMech Hires Former SLB Executive to Lead Energy Solutions Division

Eni Expands Asian Footprint with Long-Term LNG Contract in Thailand

Subscribe for OE Digital E‑News