Russian Arctic LNG 2 Starts Second Production Train

Tuesday, May 20, 2025

Russia's Arctic LNG 2 plant, which is subject to U.S. sanctions, has started production at its second train even after it has been unable to sell liquefied natural gas from a first train, a source familiar with the matter told Reuters.

Russian energy company Novatek declined to comment.

It owns 60% in the plant located on the Gydan peninsula that juts into the Kara Sea and had been set to become one of Russia's largest LNG plants with an eventual output of 19.8 million metric tons per year at three trains.

Novatek began production at Arctic LNG in December 2023, but is behind schedule in supplying cargoes of the gas because of shortages of ice-class gas carriers and Western sanctions over Russia's war with Ukraine.

According to the source, Arctic LNG 2's first production train had been shut since October 11, as sanctions have prevented any sales.

Satellite images suggested that Arctic LNG 2 resumed some output at the end of March.

Russia's officials and businessmen have been cautiously optimistic about the prospects of sanctions easing after Donald Trump took office in the United States for the second term in January, ushering in the prospect of closer ties with Vladimir Putin.

Two separate sources said Novatek has been working with lobbyists to try to rebuild U.S. relations.

(Reuters/Reporting by Marwa Rashad; writing by Vladimir Soldatkin; editing by Barbara Lewis)

Categories: LNG Production LNG. Gas

Related Stories

INPEX Extends Pertamina LNG Pact, Signs Upstream MoU in Southeast Asia

PRIO Brings Second Wahoo Well Online off Brazil

Serica Posts 50% Profit Drop Due to Triton FPSO Downtime

Current News

US Exempts Gulf of Mexico Drillers from Endangered Species Rules

Fugro to Conduct Site Investigation for South America’s First Offshore Wind Project

Sarens Helps Atlantic Canada Bulk Terminal Undergo Adaptation as Hub for Offshore Wind

Prysmian Shares North American Leadership Transitions

Subscribe for OE Digital E‑News