TDI-Brooks Completes Trinidad Geotechnical Project

Wednesday, February 26, 2025

TDI-Brooks reportst that it "effectively and safely" carried out a third-party geotechnical coring project for Geohidra. This operation was conducted from the DRAGON Field to the HIBISCUS platform off the coast of Venezuela and Trinidad aboard the DONA JOSE II (DJII). Throughout this campaign, TDI-Brooks performed a total of eighteen (18) Cone Penetration Tests (CPTs) utilizing their Neptune 3,000 miniature coiled rod CPT system, achieving penetration depths between 3.25 and 6.25 meters in water depths of 130 to 150 meters. Additionally, eighteen (18) Box Core samples and eighteen Cyclic Mini T-Bar tests on Box Core samples were completed.

Categories: Technology Offshore Energy Hydrographic Geoscience Ocean News

Related Stories

Viridien, TGS Kick Off Next Phase of Laconia Sparse OBN Survey in US Gulf

Viridien, TGS Kick Off Next Phase of Laconia Sparse OBN Survey in US Gulf

Nigerian Firm Orders HydroSurv’s Hybrid USV for Offshore Survey Ops

Nigerian Firm Orders HydroSurv’s Hybrid USV for Offshore Survey Ops

Fugro Expands Geotechnical Testing Capabilities in Indonesia

Fugro Expands Geotechnical Testing Capabilities in Indonesia

Current News

Egypt Still on Hold as Israel Resumes Limited Gas Exports

Norway's Oil and Gas Output Falls Behind Forecast In May

Scottish Floating Wind Farm Secures Onshore Planning Consent

First Steel Cut for HVAC Infrastructure for Belgian Offshore Energy Hub

Subscribe for OE Digital E‑News

Offshore Engineer Magazine