Equinor Gets Nod for Extended Production from Mikkel Field

Tuesday, November 15, 2022

The Norwegian oil and gas compan Equinor has recently obtained consent for extended operation of the Mikkel field offshore Norway.

Under the consent, granted to Equinor by the Petroleum Safety Authority Norway (PSA), Equinor will continue operations at the Mikkel fielduntil 31 December 2039.

Mikkel is a field in the eastern part of the Norwegian Sea, 30 kilometers north of the Draugen field. 

The water depth in the area is 220 meters. 

Mikkel was discovered in 1987, and the plan for development and operation (PDO) was approved in 2001.

The field is developed with two subsea templates tied-back to the Åsgard B platform . Production started in 2003.


Categories: Energy Industry News Activity Europe Production Norwegian Sea

Related Stories

Mocean Energy’s Blue X Wave Device and Verlume’s Halo Battery Come Ashore

Green Volt Floating Wind Farm Secures All Planning Approvals in UK

BP Starts Oil Production at Major New Platform Offshore Azerbaijan

Current News

Talos Energy Makes Leadership Team Changes

SOVs – Analyzing Current, Future Demand Drivers

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Skanska Set for South Brooklyn Marine Terminal Buildout

Subscribe for OE Digital E‑News