Equinor Gets Nod for Extended Production from Mikkel Field

Tuesday, November 15, 2022
Åsgard B - Photographer / Originator:Øyvind Hagen
Production Company: Equinor

The Norwegian oil and gas compan Equinor has recently obtained consent for extended operation of the Mikkel field offshore Norway.

Under the consent, granted to Equinor by the Petroleum Safety Authority Norway (PSA), Equinor will continue operations at the Mikkel fielduntil 31 December 2039.

Mikkel is a field in the eastern part of the Norwegian Sea, 30 kilometers north of the Draugen field. 

The water depth in the area is 220 meters. 

Mikkel was discovered in 1987, and the plan for development and operation (PDO) was approved in 2001.

The field is developed with two subsea templates tied-back to the Åsgard B platform . Production started in 2003.


Categories: Energy Industry News Activity Europe Production Norwegian Sea

Related Stories

Russia Looks to Myanmar Offshore Oil and Gas Prospects

Russia Looks to Myanmar Offshore Oil and Gas Prospects

Equinor’s Johan Castberg Field Starts Producing at Peak Capacity

Equinor’s Johan Castberg Field Starts Producing at Peak Capacity

Vår Energi, Kistos Energy Greenlight Balder Phase VI Project in North Sea

Vår Energi, Kistos Energy Greenlight Balder Phase VI Project in North Sea

Current News

Seequent Receives Award at Global Offshore Wind 2025, Hosts Upcoming Webinar

Libya Blocks Greek Tender for Hydrocarbon Exploration Off Crete

Russia Looks to Myanmar Offshore Oil and Gas Prospects

TotalEnergies’ Offshore Platform Workers in UK Secure Better Conditions

Subscribe for OE Digital E‑News

Offshore Engineer Magazine