FEED Contract Awarded for Ulsan Gray Whale 3 Floating Wind Farm in S. Korea

Wednesday, August 17, 2022

Technip Energies, in consortium with Subsea 7 and Samkang M&T, has been selected by Corio Generation and TotalEnergies to perform a Front-End Engineering Design (FEED) for their Ulsan Gray Whale 3 Offshore Windfarm project, located offshore the East Coast of South Korea. 

The FEED contract covers engineering for floater, mooring, and inter-array cable (IAC) in collaboration with a wind turbine supplier. The design of the floating foundation will include Technip Energies’ in-house floater technology INO15. 

With a capacity of 15 megawatts, INO15 technology is a three columns semi-submersible floater suited for large series production. 

The Gray Whale 3, aiming to develop a 504MW floating offshore wind farm located around 60 to 70 kilometers from Onsan Port in Ulsan, is one of the three offshore wind projects with a total installed capacity of 1.5 gigawatts that Corio Generation and TotalEnergies are promoting off the coast of Ulsan.

Categories: Energy Renewable Energy Engineering Industry News Activity Asia Offshore Wind

Related Stories

UTEC Gets Offshore Wind Survey Job in Taiwan

US Plans 12 Offshore Wind Auctions Over Five Years

Vestas and Maersk to Build Offshore Wind Logistics Base in South Korea

Current News

Cyprus Seeks Improvements to Chevron-led Plans for Offshore Gas Field

Equinor Seeks to Revive Costly Norway, Canada Oil Prospects

France Launches Call for 2.5 GW of Offshore Wind Tenders

ConocoPhillips Misses Quarterly Profit Estimates

Subscribe for OE Digital E‑News