Yinson Orders MAN Equipment for FPSO Maria Quitéria

OE Staff
Thursday, July 7, 2022

Malaysian FPSO leasing company Yinson has ordered five centrifugal compressor trains for gas production and export from MAN Energy Solutions for a Brazil-bound FPSO. For the same FPSO, MAN is also supplying two screw compressor trains, which will be used as gas recovery systems. Financial details were not disclosed.

All compressor trains will be deployed on the FPSO Maria Quitéria  (previously called FPSO Integrado Parque das Baleias "IPB"), which will be situated around 80 kilometers off the coast of Anchieta, off Espírito Santo, Brazil, at the Jubarte Field in the northern Campos Basin. 

The field is operated by Petrobras and lies at a water depth of approximately 1300  meters. Once ready for operation at the end of 2024, the FPSO will have a production capacity of 100,000 barrels of oil and five million Sm3 of gas per day.  



MAN Energy Solutions' scope of supply comprises three radial compressor trains type RB 45 as low-pressure systems and two type RB 28 as high-pressure systems, each driven by an electric motor. The machines will be utilized for both gas exporting and gas lifting applications in order to maximize the flow rate and efficiency of gas production. 

The two SKUEL321/CP200 screw compressor trains will be driven by electric motors and used as vapor recovery units. The resulting flash gas is pressurized by the screw compressors and fed back into the process rather than being flared. 

"This process not only increases the efficiency of the gas production but also significantly reduces its CO2 emissions," MAN said.

Categories: Energy Industry News Activity FPSO Floating Production

Related Stories

TotalEnergies, OQ Reach FID for Marsa LNG Project in Oman

Techouse Delivers Voyageur Spirit FPSO Equipment

BW Offshore Sets Out Plans to Recycle FPSO Petróleo Nautipa

Current News

US Plans 12 Offshore Wind Auctions Over Five Years

Equinor Wraps Up Hammerfest LNG Leak Repair, Maintains Friday Restart

Namibia Targets First Oil Production from Venus Field in 2029/2030

Second HVDC Platform Installed at World’s Largest Offshore Wind Farm

Subscribe for OE Digital E‑News