Strohm to Deliver TCP Subsea Water Alternating Gas (WAG) Jumper for Exxon's Guyana Project

OEDigital
Friday, July 1, 2022
Credit: Strohm

U.S. oil major ExxonMobil is set to install a subsea water alternating gas (WAG) jumper made from Strohm’s Thermoplastic Composite Pipe (TCP) on the Liza Phase 2 project offshore Guyana. 

This will be followed by a multi-jumper deployment campaign on ExxonMobil's and its co-venturers’ Yellowtail project using the Strohm's ‘Jumper on Demand’ procurement model.

Strohm has delivered the TCP Jumper for a planned installation this year. As well as marking the first use of TCP in South America, it will also be one of the first for Strohm’s Carbon Fibre PA12 TCP material group of pipes.

TCP in Place of Steel

The Liza Phase 2 TCP Jumper, which will be used in place of a steel jumper, will be installed in deep-water at depths of approximately 1,700m, and be used  for water and gas injection services for the operator’s high pressure well injection application. The award of the jumper follows on from a successful feasibility engineering project and qualification programme for TCP.



On the back of the Liza field award for the WAG jumper, Strohm was also awarded a contract to supply Carbon Fibre PA12 TCP for all WAG jumpers to be delivered to the Yellowtail project in 2024. 

"The ‘Jumper on Demand’ procurement model takes advantage of volume cost savings in the entire supply chain and involves shipping a continuous section of pipe to the in-country site. The continuous pipe is subsequently cut to length, terminated, and tested by the client," Strohm explained.

Gavin Leiper, vice president Americas (excluding Brazil) for Strohm, said: “This first award in the Americas for such a prestigious project as Liza Phase 2 has made everyone at Strohm extremely proud, with the additional contract for ‘Jumper on Demand’ for Yellowtail giving true credibility to the advantages and increasing popularity of TCP around the world”.  

The TCP Jumpers will be manufactured in Strohm’s facility and headquarters in IJmuiden, the Netherlands.

Categories: Technology Energy Activity Production South America

Related Stories

Equinor Restarts Hammerfest LNG Output

Argentina’s 30 MMtpa LNG Ambition by 2030 – Is It feasible?

Argentina’s 30 MMtpa LNG Ambition by 2030 – Is It feasible?

Brent Oil Prices Hover While Facing Geopolitical Tensions, WTI Weakens Further

Brent Oil Prices Hover While Facing Geopolitical Tensions, WTI Weakens Further

Current News

DOF Group ASA Shares Financial Report for Q2 2025

ANP to Offer Seven Blocks for Auction Offshore Brazil

Kabal Wins Contract with Phu Quoc Petroleum Operating Company to Optimize Offshore Logistics in Vietnam

Seabound Secures $1.48m Grant to Develop Carbon and Emissions Capture at Port of Southampton

Subscribe for OE Digital E‑News

Offshore Engineer Magazine