Petronas: Baram Oil Production to Resume in Q3, after Ship Accident

Florence Tan
Wednesday, January 6, 2021

Malaysia’s state energy firm Petronas said on Monday it expects to resume full production at its Baram facilities, off the state of Sarawak on Borneo island, in the third quarter after halting output in October following an accident.

Petronas declared force majeure at its Miri crude oil terminal on Oct. 29 as a result of the ship collision on Oct. 27 at the Baram field, a company spokesman told Reuters.

Two crew of the Malaysian offshore support vessel MV Dayang Topaz died after their ship rammed into the Baram B oil platform in bad weather.

“Rectification work is currently being carried out at the Baram facilities, which are expected to resume full production in Q3 2021,” it said.

Separately, Petrofac, the operator of the Cendor terminal, offshore Peninsular Malaysia, declared force majeure at the hub on Dec. 4 due to a “technical malfunction”, Petronas said.

“An investigation is ongoing and the Cendor terminal is currently on partial production mode,” Petronas said, without providing a timeline for when the terminal can resume full output.

Reuters reported on the forces majeures last month.


(Reporting by Florence Tan; Editing by Jan Harvey and Barbara Lewis)

Categories: Maritime Safety Industry News Activity Production Asia

Related Stories

China's SPIC Connects New Offshore Wind Farms to National Grid

Equinor Exits Ireland with $434M Sale of Corrib Gas Field Stake to Vermilion Energy

Thai Oil Firm PTT Expands Pharma Business with $475M Alvogen Deal

Current News

Floating WInd Tech: TetraSpar Demonstrator Starts Operation Off Norway

Report: Halliburton Offers to Buy Exxon's Stake in Iraq's West Qurna 1 Oilfield

Ørsted Reaches FID on Two German Offshore Wind Farm Projects

UAE's ADNOC to Invest $127B in 2022-26 as Oil, Gas Reserves Rise

Subscribe for OE Digital E‑News