VIDEO: Nova Module Installed on Neptune's Gjøa Platform

Monday, May 11, 2020

Oil companies Neptune Energy and Wintershall Dea have informed that the 740-tonne topside module for the Nova development project in the Norwegian North Sea was lifted aboard the Neptune-operated Gjøa platform.

The Nova topside module was installed by the world’s largest crane vessel, Heerema Marine Contractors’ Sleipnir. The module will be used the develop Wintershall's Nova field, located about 120 kilometers northwest of Bergen and approximately 17 kilometers southwest of the Gjøa platform in the Norwegian North Sea, at a water depth of 370 meters.

The Nova field is being developed as a subsea tie-back, connecting two templates to the Gjøa platform. When Nova production begins in 2021, the topside module will receive the hydrocarbons from the field and provide water injection for pressure support and gas lift.

"Sharing infrastructure and making use of smart subsea solutions reduces costs, improves efficiency and lowers the carbon intensity of the operations for Wintershall Dea and Neptune," the two companies said.

The Duva and Gjøa P1 fields, both operated by Neptune, will also be tied-back to Gjøa in the future.

 

Categories: Energy Industry News Activity Europe Production

Related Stories

Chevron Joins SLB, TotalEnergies Digital Subsurface Collaboration

Equinor Warns Rosebank, Jackdaw Rejection Could Deter UK Investment

TWMA Takes Multi-Million-Dollar North Sea Drilling Services Job

Current News

Nigeria Puts 40 Oil and Gas Blocks on Offer in Latest Licensing Round

Costs Rise for Aker BP's Yggdrasil and Valhall-Fenris Oil and Gas Projects

Verlume Clears Key Test for Offshore Wind Subsea Battery

Chevron, EGAS Ink $88M Mediterranean Oil and Gas Exploration Deal

Subscribe for OE Digital E‑News