Subsea 7 Wins Chevron Gulf of Mexico Work

Friday, December 20, 2019

Offshore services company Subsea 7 on Friday announced it has secured a contract from Chevron for the subsea installation services at the St. Malo field, located in the Walker Ridge area of the Gulf of Mexico.

Subsea 7’s scope of work includes project management, engineering, procurement, construction and installation (EPCI) of the multiphase pump system at the St. Malo field, a 14 mile water injection flowline system, inclusive of a Swagelining polymer lined flowline, and the water injection control system, the company said.

Project management and engineering will commence immediately at Subsea 7’s offices in Houston. Fabrication of the water injection flowline and riser will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations occurring in 2021.

Craig Broussard, Vice President for Subsea 7 US, said, “The St. Malo multiphase pump system and water injection projects award is an important win for the Gulf of Mexico region. It combines the utilization of our newest pipelay vessel, the Seven Vega, along with Subsea 7’s proven project execution capabilities and Swagelining’s polymer lining technology. In addition, the combination of the SURF scope for Subsea 7 and ongoing subsea equipment delivery by OneSubsea, will allow the Subsea Integration Alliance to work in collaboration with Chevron to unlock the value of an integrated approach to project optimization.”

Categories: Engineering Subsea Production Pipelay Vessel

Related Stories

Akrake Achieves First Oil at Sèmè Field as Parent Firm Reviews Options

New Alliance Targets Offshore Caisson Integrity Challenges

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Current News

Ndungu Full-Field Starts Up Offshore Angola

Norway's 2025 Oil Output Climbs to Highest Level Since 2009

AKOFS Offshore Inks New Vessel Deal with Petrobras

UK Trade Body Challenges Government View on North Sea Gas Decline

Subscribe for OE Digital E‑News