Subsea 7 Wins Chevron Gulf of Mexico Work

Friday, December 20, 2019

Offshore services company Subsea 7 on Friday announced it has secured a contract from Chevron for the subsea installation services at the St. Malo field, located in the Walker Ridge area of the Gulf of Mexico.

Subsea 7’s scope of work includes project management, engineering, procurement, construction and installation (EPCI) of the multiphase pump system at the St. Malo field, a 14 mile water injection flowline system, inclusive of a Swagelining polymer lined flowline, and the water injection control system, the company said.

Project management and engineering will commence immediately at Subsea 7’s offices in Houston. Fabrication of the water injection flowline and riser will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations occurring in 2021.

Craig Broussard, Vice President for Subsea 7 US, said, “The St. Malo multiphase pump system and water injection projects award is an important win for the Gulf of Mexico region. It combines the utilization of our newest pipelay vessel, the Seven Vega, along with Subsea 7’s proven project execution capabilities and Swagelining’s polymer lining technology. In addition, the combination of the SURF scope for Subsea 7 and ongoing subsea equipment delivery by OneSubsea, will allow the Subsea Integration Alliance to work in collaboration with Chevron to unlock the value of an integrated approach to project optimization.”

Categories: Engineering Subsea Production Pipelay Vessel

Related Stories

DeepOcean Set for Long-Term IMR Duty with Vår Energi

EnQuest Set to Top 2025 Production Forecast on Southeast Asia Gains

Technip Energies Gets On Board Thailand’s First CCS Project

Current News

Canada’s $4B Floating LNG Scheme Secures 12-Year Export Deal

Iberdrola Applies Spanish Coating Tech for German Offshore Wind Farm

DeepOcean Set for Long-Term IMR Duty with Vår Energi

Fugro Nets Mubadala Energy’s Deepwater Gas Job in Asia

Subscribe for OE Digital E‑News