Subsea 7 Wins Chevron Gulf of Mexico Work

Friday, December 20, 2019

Offshore services company Subsea 7 on Friday announced it has secured a contract from Chevron for the subsea installation services at the St. Malo field, located in the Walker Ridge area of the Gulf of Mexico.

Subsea 7’s scope of work includes project management, engineering, procurement, construction and installation (EPCI) of the multiphase pump system at the St. Malo field, a 14 mile water injection flowline system, inclusive of a Swagelining polymer lined flowline, and the water injection control system, the company said.

Project management and engineering will commence immediately at Subsea 7’s offices in Houston. Fabrication of the water injection flowline and riser will take place at Subsea 7’s spoolbase in Ingleside, Texas, with offshore operations occurring in 2021.

Craig Broussard, Vice President for Subsea 7 US, said, “The St. Malo multiphase pump system and water injection projects award is an important win for the Gulf of Mexico region. It combines the utilization of our newest pipelay vessel, the Seven Vega, along with Subsea 7’s proven project execution capabilities and Swagelining’s polymer lining technology. In addition, the combination of the SURF scope for Subsea 7 and ongoing subsea equipment delivery by OneSubsea, will allow the Subsea Integration Alliance to work in collaboration with Chevron to unlock the value of an integrated approach to project optimization.”

Categories: Production Pipelay Vessel Engineering Subsea

Related Stories

Tendeka Secures $30M in New Contracts

Aker Solutions Wins More Work at Tommeliten Alpha Development

Gulf of Mexico: Equinor's Titan Offshore Platform Still Shut

Current News

Seismic Firm Starts Review of Strategic Options, Including Potential Merger or Sale

RWE Qualifies as Bidder for 270MW French Floating Wind Tender

Drilling Contract Terminated for Sunken Jack-up Rig in Malaysia

Aker BP Gets Approval to Drill Mugnetind Offshore Prospect

Subscribe for OE Digital E‑News