Leviathan Platform Starts Voyage to Israel

Sunday, July 14, 2019

The gas platform for the Leviathan natural gas field is on its way to Israel from the Gulf of Mexico, the partners in the project said on Sunday.

The first of four barges transporting the production structure units has left Texas and the other three will set sail in the coming weeks. In September, all the units will be installed on the jacket of the platform already in place 10 kilometers from Israel's shore.

After connecting the units to the platform, Noble Energy, one of Leviathan's partners, will start a series of commissioning tests before initiating commercial gas flow to the domestic market before the end of 2019.

Earlier this month, testing of a subsea natural gas pipeline to Egypt was completed, in the wake of a deal to export $15 billion in gas to a customer in Egypt.

Leviathan, with 22 trillion cubic feet of reserves, was discovered in 2010 and is one of the world’s largest gas discoveries of the past decade. 


(Reporting by Steven Scheer; Editing by Tova Cohen)

Categories: Middle East Engineering Subsea Activity Production Natural Gas

Related Stories

Chevron Joins SLB, TotalEnergies Digital Subsurface Collaboration

KBR to Support Aramco’s Marjan Offshore Field Upgrade

DOF Nears Large Contract for I-Class Vessel

Current News

Oil Stabilizes as IEA Moves to Speed Up Emergency Stock Releases

ExxonMobil Plans Guyana Gas Pipeline Repairs Ahead of Startup

US Set to Roll Back Methane Leak Controls on Oil and Gas Industry

Equinor Finds More Gas at Gullfaks Field in North Sea

Subscribe for OE Digital E‑News