Jumbo Completes Mooring Installation in Egypt

Laxman Pai
Tuesday, July 2, 2019

Netherlands-based Jumbo’s Fairplayer has completed the pre-installation and tensioning of a shallow water CALM buoy mooring system at a depth of 26 meters for the Mersa El-Hamra terminal offshore Egypt.

The heavy lift shipping and offshore transportation and installation contractor said in a press note that Jumbo’s scope included the pre-lay of 10 Stevshark drag anchors and 6 chain moorings and the subsequent tensioning of the mooring legs up to 512 metric tons, for our client WEPCO / Micoperi.

Given a short lead time, Jumbo said its project team managed to prepare for the full scope of work and provide the required project procedures, equipment and personnel on-time.

Categories: Offshore Shallow Water Mooring Industry News Activity Africa

Related Stories

Shell Forecasts 65% Surge in Global LNG Demand by 2050

Markets: Oil Majors Reload Exploration Hoppers Across Sub-Saharan Africa

MODEC to Supply Mooring System for Coral Norte FLNG off Mozambique

Current News

Vår Energi Swaps Assets with Equinor to Bolster Gjøa Position

Shell Forecasts 65% Surge in Global LNG Demand by 2050

Ex-Pemex Chief Investigated for Abuse; Mexican President Sheinbaum Offers No Protection

ABS Helps Blaze a Digitization Path, Reshaping Offshore Energy

Subscribe for OE Digital E‑News