Jan de Nul Completes Umbilical Installation Offshore Egypt

Laxman Pai
Tuesday, January 8, 2019

Marine engineering firm Jan De Nul Group Jan De Nul Group has completed the installation and burial of the two main subsea umbilicals for the exploitation of new gas fields in the West Nile Delta concessions, located in the North Alexandria region, offshore Egypt.

According to the company release, specifically for this project, Jan De Nul Group reconfigured its multi-purpose vessel Willem de Vlamingh into an efficient Umbilical Installation Vessel.

The two umbilicals, with a total length of 69 km, were loaded in Norway in May 2018 and transported to Egypt. The installation campaign started with a 3-km beach pull for which the Willem de Vlamingh positioned in water depths of 7 m. Water depths significantly increased along the route.

The campaign was finalized early August 2018 with the installation of the Umbilical Termination Assembly at 600 meters water depth.

Installation and burial were performed in parallel to safeguard the critical main umbilical. Willem de Vlamingh installed the umbilical onto the seabed, directly followed by Isaac Newton for simultaneous burying of the umbilical using the jet trenching method.

Categories: Offshore Subsea Installation Offshore Energy

Related Stories

TGS Embarks on Multi-Client 2D Survey off Angola

Transocean-Valaris Tie-Up to Create $17B Offshore Drilling Major with 73 Rigs

Eni Enlists Shearwater for 3D Seismic Survey in Timor Sea

Current News

AF Offshore Secures North Sea Decom Job

Island Offshore’s Hybrid OECV Hits Water at Vard Yard in Romania (Video)

Jumbo Offshore Wraps Up Errea Wittu FPSO Mooring Pre-Lay in Guyana

Petronas Takes Operatorship of Oman’s Offshore Block 18

Subscribe for OE Digital E‑News