BW Gets Extension for Polvo FPSO

Friday, January 4, 2019

BW Offshore announced Firday it has secured another one-year extension for the lease and operation of the floating production storage and offloading vessel (FPSO) Polvo in the Campos basin offshore Brazil.

The agreement signed with PetroRio extends the firm period from Q3 2019 to Q3 2020, with options until Q3 2022.

The Polvo oil field was brought onstream in 2007. The field installations include the BW operated FPSO Polvo, as well as the Polvo A wellhead platform with a drilling rig and an infield pipeline.

The FPSO has capacity to process an average of 100,000 barrels per day and store up to 1 million barrels.

Categories: Contracts FPSO South America Floating Production Vessels Production

Related Stories

TechnipFMC Keeps DOF's Skandi Africa Subsea Vessel on Contract

Shell Brings Deepwater Gas Fields Onstream off Malaysia

SBM Offshore Lands Longtail FPSO Deal, Saipem Gets Go-Ahead from ExxonMobil

Current News

Indonesia Approves Plan of Development for Geliga Oilfield Six Months After Discovery

First Nordseecluster B Monopiles Arrive at Dutch Port

Dolphin Drilling Closes Rig Sale, Signs India JV Deal with SPM Energy

Arabian Drilling Seals $400M Offshore Vessel Deal with KJO

Subscribe for OE Digital E‑News