CX-15 tower installation

OE Staff
Tuesday, March 5, 2013

Offshore engineering firm GMC Ltd. provides this video of the 2,500-ton CX-15 buoyant tower, touted at the world's largest, being installed at Corvina Field off Peru for BPZ Energy. The tower hull measures 69.9m with four, ring-stiffened connected cylindrical tubes including one central suction pile. Installed in October, the CX-15 supports a 1,500-ton, three-level topsides facility – designed by Audubon Engineering and GMC – and has a production capacity of 12,200 b/d and 12.8 MMcf/d of gas. BPZ Energy said it expects to drill its first well on the development within three to six weeks time.

Categories: Drilling Production South America System Design Installation

Related Stories

Petrobras Finds Oil in Ultra-Deep Waters of Potiguar Basin

LLOG Approves Who Dat East and South Drilling Campaign in Gulf of Mexico

PGS Secures 3D Contract in South Atlantic

Current News

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Norway Clears TGS and PGS Merger

Full Capacity Operations at Tyra II Gas Development Up for Potential Delays

Subscribe for OE Digital E‑News