Technip signs four-year deal with Petrobras

OE Staff
Wednesday, September 4, 2013

Technip signed a four-year frame agreement with Petrobras for projects modifications services for the Rio de Janeiro Operations Unit, including existing offshore platforms located in the Campos Basin area, Brazil.

The services comprise basic and detailed design, documentation update, engineering consulting, planning, control and execution supplies for 13 offshore platforms. Technip was previously awarded contracts on some of these projects, most notably designing and constructing the topsides of three of Petrobras’ deepwater production semis – P-51, P-52 and P-56 – the largest topsides floatovers onto semi hulls in the world.

Technip’s operating center in Rio de Janeiro will carry out the project management, engineering and procurement. Services will be performed upon client request.

Jose Jorge Araujo, Technip’s senior VP of Onshore Latin America & Offshore Brazil, said: “This award reasserts Technip in Brazil’s competitiveness as a top-class services provider and reinforces our long-term commitment to Petrobras’ key projects.”

The Rio de Janeiro Exploration and Production Operations Unit (UO-RIO) was created on November 1, 2000, from the restructuring of Petrobras' Exploration and Production business segment. 

It currently manages six concessions located in deep and ultra-deep Campos Basin waters, where the Albacora Leste, Barracuda, Caratinga, Marlim Leste, Marlim Sul, and Roncador fields are located. UO-RIO currently operates 15 offshore platforms, becoming the Petrobras' biggest production unit regarding oil and gas output. Two new platforms, P-55 and P-62, have startup foreseen in 2013 and 2014, respectively.

Categories: South America

Related Stories

Women in Maritime Day: Shaping the Future of Maritime Safety

Australia Backs Long-Term Gas Drilling Despite 2050 Climate Goals

Petrobras Required to Assess Indigenous Impact of Amazon Offshore Drilling

Current News

Sapura Ônix Heads to Atlanta Field to Install Subsea Equipment

Prysmian Cements Partnership with Port of Middlesbrough with New Long-Term Deal

Gulfstream LNG Projects Receives FERC Approval to Start Pre-Filling Process

Serica Energy Gets Go-Ahead to Develop Belinda Field

Subscribe for OE Digital E‑News