Technical issues strike Cobalt's North Platte campaign

OE Staff
Thursday, April 9, 2015

Cobalt International Energy opted to plug and abandon its North Platte No. 2 appraisal well at Garden Banks Block 959 in the deepwater Gulf of Mexico due to a seal failure in the riser connection system, the company announced on 9 April.

The well, drilled by the Rowan Reliance drillship, was at a depth of 20,701ft when the problem with the riser was detected. The well was permanently abandoned prior to reaching any geological targets.

Cobalt is currently permitting the North Platte No. 3 well approximately 200ft from the surface location of the North Platte No. 2 well. Assuming timely receipt of permit approval, Cobalt anticipates spudding the North Platte No. 3 well within two weeks and continues to expect well results in 2H 2015.

Drilled in 2012, the North Platte No. 1 discovery well encountered over 550ft net of oil pay in multiple high-quality inboard Lower Tertiary reservoirs. Cobalt, as operator, holds a 60% working interest in North Platte. Total holds the remaining interest.

Categories: Drilling Gulf of Mexico Rigs

Related Stories

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

PV Drilling Names New ‘Super Rig’ ahead of April Operations

Reach Subsea Secures Equinor Contracts for Uncrewed Vessel Operations

Current News

DroneQ Robotics, Mark Offshore Collaborate with R/V Mintis

OMV Petrom’s Black Sea Well Fails to Find Significant Gas Volumes

Eco Wave Power Completes Los Angeles Wave Energy Pilot with Shell

Borr Drilling Secures New Drilling Rig Contracts Across Four Regions

Subscribe for OE Digital E‑News