Aker BP orders from Plexus

OE Staff
Friday, May 19, 2017

Aker BP has made its first order with Plexus Holdings, specifically, for the supply of surface exploration wellhead equipment for the Hyrokkin and Nordfjellet standard pressure exploration wells, offshore Norway.  

The initial value of the contract is about £0.7 million, with potential for the contract to be extended to include additional wells in the future. 

Plexus has developed a new connector called POS-SPEED to help deliver time savings for the operator. The initiative builds on time savings and cost efficiencies delivered by the company's 18-3/4in POS-GRIP through BOP surface wellhead. Each of the wells are expected to take around 30 days to drill.  

Categories: Drilling Europe Well Operations

Related Stories

OEG to Supply Temporary Power for Hornsea 3 Offshore Wind Farm Buildout

Transocean Adds $1.1B to Offshore Drilling Backlog

TotalEnergies Selects SLB for Global Digital Drilling Program

Current News

Incat Crowther to Build Fourth Fast Support Intervention Vessel

Equinor Exercises Two Well Option for Deepsea Atlantic Rig

Taiwan's 1GW Hai Long Offshore Wind Farm Brings All Turbines Online

ACCIONA Lands 2GW Offshore Wind Grid Deal in Australia

Subscribe for OE Digital E‑News