Bideford Dolphin to drill at Snorre field

OE Staff
Tuesday, June 20, 2017

Norway’s Petroleum Safety Authority (PSA) has given Statoil consent to use the Bideford Dolphin for drilling and completing well 34/7-A-10 at the Snorre field in the North Sea.

Drilling is scheduled to begin on 7 July and last 110 days.

Snorre is in the Tampen area of the North Sea, and has been developed using two floating integrated production facilities, Snorre A and B, and one subsea template tied back to Snorre A. Snorre began producing oil in 1992.

Operated by Dolphin Drilling, Bideford Dolphin is a mobile drilling facility of the Aker H-3 type, built at Aker Verdal in 1975 and modified in 1998. The facility is classified by DNV GL and registered in Singapore. Bideford Dolphin was issued with an Acknowledgement of Compliance by the PSA in September 2004.

Last month, PSA granted Statoil permission to use the Bideford Dolphin to drill a production well at Vigdis in the Norwegian North Sea.

Read more:

Statoil to drill Vigdis with Bideford Dolphin

Categories: Europe North Sea

Related Stories

Unity Wins North Sea Decom Contracts, Expands Overseas

ADES Extends North Sea Rig Contract to Three-Year Term

Viridien Kicks Off Multi-Client OBN Survey in North Sea’s Frigg Area

Current News

Amplitude Energy Takes Stake in Artisan Gas Field

SBM Offshore’s SWIR Technology Receives ABS Statement of Maturity

Baker Hughes Expands Integrated Well Construction Contract with Petrobras

Mexican Billionaire Slim Calls Pemex's Lakach Project “Irrational”

Subscribe for OE Digital E‑News