Bideford Dolphin to drill at Snorre field

OE Staff
Tuesday, June 20, 2017

Norway’s Petroleum Safety Authority (PSA) has given Statoil consent to use the Bideford Dolphin for drilling and completing well 34/7-A-10 at the Snorre field in the North Sea.

Drilling is scheduled to begin on 7 July and last 110 days.

Snorre is in the Tampen area of the North Sea, and has been developed using two floating integrated production facilities, Snorre A and B, and one subsea template tied back to Snorre A. Snorre began producing oil in 1992.

Operated by Dolphin Drilling, Bideford Dolphin is a mobile drilling facility of the Aker H-3 type, built at Aker Verdal in 1975 and modified in 1998. The facility is classified by DNV GL and registered in Singapore. Bideford Dolphin was issued with an Acknowledgement of Compliance by the PSA in September 2004.

Last month, PSA granted Statoil permission to use the Bideford Dolphin to drill a production well at Vigdis in the Norwegian North Sea.

Read more:

Statoil to drill Vigdis with Bideford Dolphin

Categories: Europe North Sea

Related Stories

Equinor Gets Clearance for Drilling Ops in North Sea

Borr Drilling Reshapes Mexico Operations, Extends Rig Backlog

UK Set to Clear Jackdaw Gas Field for Production

Current News

NOIA Celebrates Passage of TWIC Workforce Bill in the House of Representatives

Golden Software Releases Newest Version of Surfer Mapping Program

Verlume, SubCtech Team Up on Subsea Power Systems

Saudi Export Disruptions Push Oil to Four-Month Highs

Subscribe for OE Digital E‑News