Bideford Dolphin to drill at Snorre field

OE Staff
Tuesday, June 20, 2017

Norway’s Petroleum Safety Authority (PSA) has given Statoil consent to use the Bideford Dolphin for drilling and completing well 34/7-A-10 at the Snorre field in the North Sea.

Drilling is scheduled to begin on 7 July and last 110 days.

Snorre is in the Tampen area of the North Sea, and has been developed using two floating integrated production facilities, Snorre A and B, and one subsea template tied back to Snorre A. Snorre began producing oil in 1992.

Operated by Dolphin Drilling, Bideford Dolphin is a mobile drilling facility of the Aker H-3 type, built at Aker Verdal in 1975 and modified in 1998. The facility is classified by DNV GL and registered in Singapore. Bideford Dolphin was issued with an Acknowledgement of Compliance by the PSA in September 2004.

Last month, PSA granted Statoil permission to use the Bideford Dolphin to drill a production well at Vigdis in the Norwegian North Sea.

Read more:

Statoil to drill Vigdis with Bideford Dolphin

Categories: North Sea Europe

Related Stories

North Sea Energy Firms Look Beyond UK After Tax Squeeze

AGR Gets Offshore CO2 Storage Job in North Sea

Vard to Build Two CSOVs for Taiwanese Client

Current News

Outlook ‘Surprisingly Positive’ for US Offshore Wind

LR Helps Offshore Operators Navigate Tough Technical Hurdles

Expro Wraps Up Five-Well Subsea Job in Australia

US Drillers Add Oil and Gas Rigs for First Time in Four Weeks

Subscribe for OE Digital E‑News