Ramp up at Kiliwani North

OE Staff
Monday, July 4, 2016

Aminex has increased gas production from the Kiliwani North-1 well, offshore Tanzania.

The well, drilled on the Kwiliwani North field from Songo Songo Island island, was brought on stream in April. It reached 30 MMcf/d boe at the weekend and the commissioning process at the Songo Songo Island gas plant, from which a pipeline will carry the produced gas to the mainland, is expected to be concluded with the testing of the well due to determine optimal rates.

The field was discovered in 2008 and contains an estimated 28 Bcf contingent resources. 

Categories: Natural Gas Africa

Related Stories

ABL Secures Work at Egypt’s Kamose Gas Field

Digital Threatscape is Rapidly Evolving for Global Energy Systems

Egypt Instructs International Oil Companies to Double Production by 2030

Current News

Trump Calls Out California, UK Energy Deal

DOF Group ASA Awarded Contract in Argentina

Jifmar, Seavium Partner to Roll Out AI Across Offshore Fleet

DUG Hooks Multi-Client Seismic Reprocessing Survey off Malaysia

Subscribe for OE Digital E‑News