Production resumes at Tamar

OE Staff
Thursday, September 28, 2017

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Categories: Drilling Natural Gas

Related Stories

Slovakia Interested in Gas From Offshore Romanian Neptun Project

ExxonMobil, Halliburton Marks Automated Drilling Milestone off Guyana

Arabian Drilling Flags Temporary Offshore Rig Suspensions in Persian Gulf

Current News

Teledyne eXtreamer for Seismic Data Receives 2026 Spotlight on New Technology Award

Iran War Reshapes Global LNG Trade

US Exempts Gulf of Mexico Drillers from Endangered Species Rules

Fugro to Conduct Site Investigation for South America’s First Offshore Wind Project

Subscribe for OE Digital E‑News