Production resumes at Tamar

OE Staff
Thursday, September 28, 2017

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Categories: Drilling Natural Gas

Related Stories

OMV Petrom to Signs More Gas Contracts as Neptun Deep Nears 2027 Start

RWE, Amazon Sign Offshore Wind Power Deal in Germany

Libya Targets Higher Gas Output to Supply Europe by 2030

Current News

Longitude Launches New PSV Design to Target Cost Efficiencies

ConocoPhillips to Cut Costs as Oil Prices Weigh on Earnings

Stena Drilling’s Stena Evolution Drillship Gets DNV’s Emissions Notation

EnBW and Google Agree Offshore Wind Power Supply in Germany

Subscribe for OE Digital E‑News