Production resumes at Tamar

OE Staff
Thursday, September 28, 2017

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Categories: Drilling Natural Gas

Related Stories

Deepsea Mira Semi-Sub Up for Shell’s Drilling Job off Namibia

Ukraine Strikes Russian Oil Rig in Caspian Sea, Disrupts Production

Equinor Secures Permit for North Sea Drilling Operation

Current News

BOEM Initiates Process for Potential Mineral Lease Sale Offshore Virginia

Jumbo Scoops Two Offshore Wind Contracts

Wood Nets Long-Term Maintenance Contract for Rio Grande LNG Facility

TechnipFMC to Supply Subsea Systems for Chevron’s Gas Project off Australia

Subscribe for OE Digital E‑News