Production resumes at Tamar

OE Staff
Thursday, September 28, 2017

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Categories: Drilling Natural Gas

Related Stories

TotalEnergies Selects SLB for Global Digital Drilling Program

Chevron, EGAS Ink $88M Mediterranean Oil and Gas Exploration Deal

Borr Drilling Lines Up New Work for Jack-Up Rig Trio

Current News

Legasea Launches Subsea Basket Rental Program

Lamprell Picks IMI for Offshore Platforms and Jackets Fabrication

Eni Installs ‘World's First’ Purpose-Built Offshore CCS Platform

TotalEnergies Selects SLB for Global Digital Drilling Program

Subscribe for OE Digital E‑News