Production resumes at Tamar

OE Staff
Thursday, September 28, 2017

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Categories: Drilling Natural Gas

Related Stories

Shell’s Deepwater Mars Hits One Billion Barrels, with More to Come (Video)

Indonesia Signs Eight Oil and Gas Contracts

Aker BP Cleared to Drill Wildcat Well in North Sea

Current News

IKM Aconan to Deliver Drilling, Well Services for Vår Energi

Unity Wins North Sea Decom Contracts, Expands Overseas

Denmark Receives Offshore Wind Bids as Tender Scheme Rebounds

Borr Drilling’s First Quarter Profit Takes Hit as Odin Rig Start-Up Lags

Subscribe for OE Digital E‑News