Statoil to remove Norne emergency response vessel

Statoil has received consent from Norway’s Petroleum Safety Authority (PSA) to change the emergency response vessel solution for the Norne field in the Norwegian Sea.

Norne is an oil and gas field in the Norwegian Sea, around 80km north of Heidrun. The field has been developed using a floating production storage and offloading (FPSO) unit tied to seven well templates.

To date, Norne has had its own emergency response vessel. In connection with a change to area response for Halten Nordland, Statoil has applied for consent to remove this vessel.

The area response for Halten Nordland is now covered by two vessels.

Current News

Woodside Revenue Falls on Lower LNG, Oil Prices

Woodside Revenue Falls on Lowe

ABL Gets Neptun Deep Job for OMV Petrom in Black Sea

ABL Gets Neptun Deep Job for O

Petrobras and China’s CNCEC to Collaborate on Oil and Gas, Renewables

Petrobras and China’s CNCEC to

Norway Clears TGS and PGS Merger

Norway Clears TGS and PGS Merg

Subscribe for OE Digital E‑News

Offshore Engineer Magazine