Offshore North America News - page 271

 

BG inks alliance with KBR

Jan 28, 2015

BG Group has signed a six-year global alliance with KBR to provide technical support, services (in both the pre-FEED and FEED stages), and project management expertise across BG Group’s global upstream portfolio. Under the agreement, which has options to extend up to 10 years…

US details new offshore leasing program

Jan 27, 2015

The US Department of the Interior today (Tuesday) announced details of a proposed oil and gas leasing program for 2017-2022. US Secretary of the Interior Sally Jewell (pictured, right, with President Obama) and Bureau of Ocean Energy…

McDermott DB50 lifts 3250-tonne jacket

Jan 27, 2015

McDermott’s Derrick Barge 50 (DB50) completed the installation of a drilling and production platform that included the heavy lift of a 3250-tonne jacket in the Gulf of Mexico. The DB50 installation…

Tubular Bells topsides lift

Jan 27, 2015

Hess shows the carefully staged choreography of 14 cranes as they hoisted the 1000-tonne Tubular Bells main deck 100ft in the air to set it into place atop the production and cellar decks at a Houma, Louisiana fabrication facility. The Tubular…

Technip lands Amethyst contracts

Jan 27, 2015

Technip won two contracts for flexible pipe supply and installation at the Amethyst field, in Mississippi Canyon 26, in the US Gulf of Mexico.  The Deep Blue. From Technip.   Both contracts are for operator Stone Energy…

Fire out on Energy XXI GoM platform

Jan 23, 2015

The Bureau of Safety and Environmental Enforcement (BSEE) responded to an Energy XXI, GOM-operated platform that was damaged by a fire in South Timbalier (ST) Block 27 in the Gulf of Mexico. The unmanned ST 27 IA platform…

PPE opens new Texas facility

Jan 22, 2015

Precision Polymer Engineering (PPE) announced the official opening of its new manufacturing facility in Brenham, Texas on 12 February 12 2015. The new site, which began production in November 2014, manufactures high performance compression…

Apache chief retires from post

Jan 20, 2015

After 25 years with the company, Apache President and Chief Executive Officer G. Steven Farris announced his retirement effective today. Farris. From Apache.   The 66-year old will continue…

UH to lead offshore energy research center

Jan 20, 2015

The University of Houston (UH) will lead a national research center for subsea engineering and other offshore energy development issues, including research and technology to improve the sustainable and safe development of energy resources in the Gulf of Mexico…

Madison fails Noble

Jan 20, 2015

Noble Energy’s Madison exploration well has been plugged and abandoned in the Gulf of Mexico after no commercial hydrocarbons were found. The well was drilled to a total depth of 16,859ft in the Mississippi Canyon 479 and reached its targeted Upper and Middle Miocene objectives…

Anadarko's Lucius on stream

Jan 19, 2015

Anadarko began first production at the Lucius field in the US Gulf of Mexico. Image of the Lucius spar. From Anadarko.   Lucius is located approximately 380km southwest of Port Fourchon…

Court rules on Macondo oil spill amount

Jan 16, 2015

A US federal district court judge in Louisiana ruled on Thursday that BP’s Macondo well discharged 3.19 million barrels of oil into the US Gulf of Mexico. The ruling means that BP faces a maximum fine of US$13.7 billion under the US…

Maritime Construction orders first ice-class vessel

Jan 15, 2015

Luxembourg-based Maritime Construction Services’ subsidiary New Orient Marine awarded Keppel Singmarine a US$200 million contract to build an ice-class multi-purpose vessel. The ice-class vessel will be designed to operate in temperature…

Cosco delivers Neptuno

Jan 14, 2015

Mexico’s Cotemar S.A. De C.V. took delivery of its new emisubmersible vessel from Cosco (Nantong) Shipyard Co. The vessel, Neptuno, measures 91m in length, 67m in breadth and 27.5m in depth.

Enbridge building Stampede pipeline

Jan 13, 2015

Hess awarded Enbridge a contract to build, own, and operate a lateral pipeline estimated at US$130 million, to connect the Stampede development to an existing third-party pipeline system in the Gulf of Mexico. Gulf of Mexico platform…

Current News

Shell Greenlights Waterflood Project to Bolster Production in Gulf of America

Shell Greenlights Waterflood P

ESVAGT Acquires Two SOVs from Edda Wind

ESVAGT Acquires Two SOVs from

Dräger to Supply Gas Detection, Monitoring Tech to North Sea Operator

Dräger to Supply Gas Detection

NKT Expands Swedish Cable Accessories Plant Amid Rising Demand

NKT Expands Swedish Cable Acce

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine