Norway-based heavy transport and installation contractor Offshore Heavy Transport (OHT) has been selected as the preferred supplier for foundation installation at the Dogger Bank offshore wind farm (OWF).OHT’s new build vessel 'Alfa Lift', designed by Ulstein…
The heavy transport vessel operator Offshore Heavy Transport (OHT) has secured a contract from DEME Offshore to transport foundations for the 950MW Moray East wind farm off Scotland.The contract includes transportation of 48 jackets from Lamprell fabrication yard…
Keel laying has been completed for Norway-based Offshore Heavy Transport (OHT)'s new crane vessel Alfa Lift currently under construction at China Merchants Heavy Industry (CMHI) yard in Jiangsu.'The new heavy installation crane vessel has reached…
Norway's Ulstein Group is aiming to become a leading player in the growing offshore wind industry designing and building vessels for some of the world’s toughest areas and demanding operations.'The knowledge of how to integrate technical, operational…
Eagle and Falcon, sister vessels and the workhorses of the Offshore Heavy Transport (OHT) family, were coincidentally working side by side in Singapore earlier this month loading two jack-up rigs.Eagle started her loading operation of the 14…
Kongsberg Maritime has secured a contract worth approximately $13 million to equip a new heavy lift crane vessel for Offshore Heavy Transport (OHT) with an innovative technology suite. The vessel, a customized Ulstein Design & Solutions BV design…
Statoil is awaiting the arrival of two of its Cat J jackup rigs in the Norwegian North Sea, one destined for the Gullfaks field and the other for the Oseberg field. Category J drawing. Image from Statoil…
Norwegian firm Offshore Heavy Transport (OHT) has been contracted to transport the Transocean Winner drilling rig to Turkey using a semisubmersible heavy lift vessel. It is expected that the rig will be floated onto the semisubmersible heavy lift vessel OHT HAWK…
A containment boom deployment training exercise ahead of moving a rig which had grounded on the Scottish coast has been postponed for at least two days due to windy weather, according to the UK's Maritime and Coastguard Agency (MCA). The…
Maintaining a modern fleet with long-term contracts while setting drilling records is Maersk Drilling’s way of doing business. Eloise Logan spoke to the firm’s chief technology officer. The Maersk Voyager drillship…