Peterson Den Helder Extends Contracts for Havila Shipping's PSV Duo

Published

Norwegian offshore support vessel owner Havila Shipping has secured contract extensions for two platform supply vessels.

Havila said Monday that Peterson Den Helder had declared the 12 months optional periods for the PSVs Havila Borg and Havila Herøy.

The extended period will end in April 2024.

Financial details were not disclosed. 

The Havila Borg platform supply vessel, currently moored in Aberdeen, UK, was built by Havyard in 2009. It is 78.6 meters long, and has a deck space of 800 m2. The Havila Heroy, currently in Den Helder, the Netherlands, was also delivered by Havyard in 2009. It is 80.4 meters long and has a deck space of 805 m2.

Current News

Scottish Floating Wind Farm to Feature Siemens Gamesa Turbines

Scottish Floating Wind Farm to

DOF Strikes Sale-and-Leaseback Deal for Skandi Forza CSV

DOF Strikes Sale-and-Leaseback

NKT Starts Cable Production for Dutch IJmuiden Ver Beta Grid Link

NKT Starts Cable Production fo

Reckitt Pens 10-Year Offshore Wind Deal for Dogger Bank B

Reckitt Pens 10-Year Offshore

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine