Xodus wins pipeline contracts

Xodus Group secured two contracts from Abu Dhabi-based Valentine Maritime (Gulf) L.L.C. The first is for new subsea pipelines in the Arabian Gulf off Qatar’s northeast coast. It involves design of a new 6.4km long, 24in. water injection pipeline, including risers and two J-tubes. The project is due for completion by the end of 2013.

The second is for the pipeline installations in Fateh field including: a 30in. by 6.7km subsea oil pipeline, a 30in. by 4km subsea oil pipeline, and a 16in. by 6km subsea water injection pipeline. All include new risers and tie-ins.

Current News

Talos Energy Makes Leadership Team Changes

Talos Energy Makes Leadership

SOVs – Analyzing Current, Future Demand Drivers

SOVs – Analyzing Current, Futu

Equinor Cleared for Drilling Ops at Johan Castberg Field with Transocean Enabler Rig

Equinor Cleared for Drilling O

Skanska Set for South Brooklyn Marine Terminal Buildout

Skanska Set for South Brooklyn

Subscribe for OE Digital E‑News

Offshore Engineer Magazine