BG finds Tanzania gas

Published

BG Group has made a natural gas discovery in the Ngisi-1 well in Block 4 off Tanzania. The well, drilled by the Deepsea Metro 1 drillship, appraised the Chewa gas field resulting in an upgrade in estimated recoverable resources in the block. Recoverable resources across the Chewa-Pweza- Ngisi hub are now estimated at 4.5Tcf, up from 3.7Tcf. BG is operator of Block 4 with 60%, while partner Ophir Energy holds 40%.

Nick Cooper, CEO of Ophir, said: “The successful Ngisi drilling results provide critical mass for the aggregation and development of the gas discoveries in Block 4. These (reserves) will be piped ashore and combined with the Block 1 resources for Tanzania’s LNG development.”

Current News

SLB, Vår Energi Scale Up Digital Field Development Workflows

SLB, Vår Energi Scale Up Digit

Equinor Taps DeepOcean for Norwegian Continental Shelf Subsea Work

Equinor Taps DeepOcean for Nor

TouchWind Installs Floating Wind Prototype in Dutch Waters

TouchWind Installs Floating Wi

SeaTwirl, Mooreast Team Up on Southeast Asia Floating Wind Push

SeaTwirl, Mooreast Team Up on

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine