Lukoil prepares for Filanovsky drilling

Published

Russia's Lukoil gas started driving in marine risers at the Vladimir Filanovsky field in the Caspian Sea, ahead of planned development well drilling operations.

Risers, required to reinforce wellheads, ensure circulation and environmental safety at drilling operations, are driven down in the sea bottom to a depth of 120m, says Lukoil. It is planning to drill 13 wells at the field. 

The living quarters platform (LQP-1) topside for the Vladimir Filanovsky field arrived at its north Caspian Sea destination from Krasnye Barrikady shipyard in Russia’s Astrakhan region, in 2014. 

It is one of a number of facilities in the field, including an ice-resistant stationary platform for drilling operations, a central processing platform, and a riser block, connecting connect the infield pipelines and export pipelines. All will be interconnected with bridges, and the platform is planned to be connected to Yury Korchagin fields.

First oil had been expected for 2015 or early 2016. 

Current News

SLB, Vår Energi Scale Up Digital Field Development Workflows

SLB, Vår Energi Scale Up Digit

Equinor Taps DeepOcean for Norwegian Continental Shelf Subsea Work

Equinor Taps DeepOcean for Nor

TouchWind Installs Floating Wind Prototype in Dutch Waters

TouchWind Installs Floating Wi

SeaTwirl, Mooreast Team Up on Southeast Asia Floating Wind Push

SeaTwirl, Mooreast Team Up on

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine