Aasta Hansteen installation timelapse

Published

In this video, Statoil shows a timelapse of installation work at Aasta Hansteen conducted by Subsea 7.

Pipelines, risers and spools were installed and hooked up to subsea templates and umbilicals that were installed last year. 

The pipelines have been pressure-tested and prepared for production, and mooring lines have been carefully installed on the seabed – everything has to be ready before the platform arrives in 2018.  The Aasta Hansteen gas discovery (previously Luva) in the Norwegian Sea is situated at 1300m water depth in the Vøring area, 300km from land.

Current News

SLB, Equinor to Upgrade Vessel Under Multi-Year Well Stimulation Deal

SLB, Equinor to Upgrade Vessel

ExxonMobil Enlists McDermott JV for Rovuma LNG Pre-FID Work

ExxonMobil Enlists McDermott J

ConocoPhillips Hires Noble Corporation’s Jack-Up for Ekofisk P&A Work

ConocoPhillips Hires Noble Cor

ConocoPhillips Announces CEO Succession and CFO Appointment

ConocoPhillips Announces CEO S

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine