Hebron GBS time-lapse

In this video, Exxon shows a timelapse video of the construction of the Hebron gravity based structure (GBS), which took about five years to build. 

Exxon's  Hebron heavy oil project off Newfoundland and Labrador, Canada, sits in the Jeanne d’Arc basin about 350km southeast of St. John’s. 

Hebron will be produced through a gravity based structure (GBS), with 150,000b/d production capacity from 52 well slots, and about 1.2 MMbo storage capacity.

The field was discovered in 1980 and will become the fourth producing field in the province. It is estimated more than 700 MMbbl of recoverable resources will be produced from the field.

Current News

Gibdock Wraps Up Refurbishment of TechnipFMC's Deepwater Pipelayer

Gibdock Wraps Up Refurbishment

Portuguese Firm Bags $280M for Maintenance Work on Petrobras' Platforms

Portuguese Firm Bags $280M for

Galp Targets 40% Oil Production Boost in Brazil with New Field

Galp Targets 40% Oil Productio

Eni Starts Talks with GIP for Carbon Capture Unit Stake Sale

Eni Starts Talks with GIP for

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine