Statoil to drill at Koigen Central in Barents

Published

Noway’s Petroleum Safety Authority (PSA) has approved for Statoil to drill exploration well 7317/9-1 in the Barents Sea.

The wildcat is in a prospect named Koigen Central, in production license 718, in which Statoil is the operator.

Drilling will begin in August 2017 at the earliest, and is scheduled to last 32 days.

The well will be drilled using the Songa Enabler mobile drilling facility, which is owned and operated by Songa Offshore. 

Image from Songa.

Current News

Sea Lion Oil Project in Falkland Islands Gets Green Light

Sea Lion Oil Project in Falkla

ABB’s Streamlined DP2 System Passes Sea Trials on DEME’s Norse Wind WTIV

ABB’s Streamlined DP2 System P

Bourbon Inks Multi-Year PSV Deal with ExxonMobil in Guyana

Bourbon Inks Multi-Year PSV De

NSTA Opens UK’s Second Carbon Storage Licensing Round

NSTA Opens UK’s Second Carbon

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine