Norway's Aasta Hansteen Field to Start Producing Gas

Published

Photo: Roar Lindefjeld and Bo B. Randulff/Equinor
Photo: Roar Lindefjeld and Bo B. Randulff/Equinor

Norway's Aasta Hansteen gas field will start production from Nov. 4 and will feed the system with 12 million cubic metres (mcm) of gas per day, it's largest owner Equinor said on Thursday.

The newly connected field, which will send its production to Norway's Nyhamna plant for processing, is located in the Norwegian Sea and has an estimated recoverable volume of 51 billion cubic metres of gas.

It's owners are Equinor, Wintershall, OMV and ConocoPhillips.

Aasta Hansteen was previously expected to start production in October, Equinor had said.

Reporting by Lefteris Karagiannopoulos

Current News

Saitec Tests Nature Inclusive Design Installations at Floating Wind Platform

Saitec Tests Nature Inclusive

Van Oord, Sumitomo Sign HVDC Framework Deal for Scottish Interconnector

Van Oord, Sumitomo Sign HVDC F

Baker Hughes Lands Cheniere’s Sabine Pass LNG Expansion Work

Baker Hughes Lands Cheniere’s

Glamox Acquires UK Defense Lighting Specialist Consolite

Glamox Acquires UK Defense Lig

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine