Production resumes at Tamar

Published

Production has resumed at the Tamar gas field offshore Israel after a crack was found in an emission pipe used to release natural gas and pressure, according to partner Delek Drilling.

Noble was performing upgrade and improvement as planned, when the crack was found in the pipe, which is used routinely and in emergencies. Production was stopped on 21 September.

Today (28 September), Delek says Noble has completed a repair of the fault and production has resumed. Noble is continuing to carry out other planned upgrade works, says Delek. 

The Tamar field is in License 309 in the Matan Block, about 90km west of Haifa in the Levantine Basin. 

Noble Energy Mediterranean is the operator of the Tamar project with 32.5% stake. Partners include:  Isramco Negev 2 (28.75%), Delek Drilling (22%), Tamar Petroleum( 9.25%), Dor Gas Exploration (4%), and Everest Infrastructures (3.5%).

Read more:

Malfunction stops production at Tamar

Current News

ORLEN Acquires Stake in Afrodite Discovery from Vår Energi

ORLEN Acquires Stake in Afrodi

US Grants License to Support Oil and Gas Exploration in Venezuela

US Grants License to Support O

Malaysia Offers Nine Exploration Blocks in 2026 Bid Round

Malaysia Offers Nine Explorati

Egypt Instructs International Oil Companies to Double Production by 2030

Egypt Instructs International

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine