Some offshore wind turbine (OWT) support structures may fall short of required fatigue life expectations, according to a new Lloyd’s Register (LR) report, which also pinpointed reliability-based inspection as one of the measures to manage fatigue-driven risks in such structures.The case study evaluated a North Atlantic offshore wind farm of 60–70 turbines, with the combined 500 - 600 MW capacity.Offshore wind turbines are typically designed for 25 years of service…
Aker Solutions has unveiled three floating wind foundation designs – the YFloat, CONFloat-Omega, and CONFloat-7C – engineered to maximize energy production, simplify construction and reduce maintenance.All three have passive ballast systems…