Drydocks World Completes FPSO Upgrade, Turret Mooring Project

Published

Photo: Drydocks World
Photo: Drydocks World

Drydocks World has recently completed two projects for Bluewater Energy Services B.V. and end client Hurricane Energy plc.

The projects included the refurbishment, life extension and upgrade of the FPSO Aoka Mizu vessel, and the construction of a Turret Buoy weighing over 1,000T. In addition to the complex buoy construction project, Drydocks World teams fabricated and installed over 1,000T of structural steel, 1,800 pipe spools (including Duplex), and 55km of cables on the FPSO.

The FPSO Aoka Mizu will be deployed on the Lancaster field, west of the Shetland Isles, U.K., moored in a water depth of c. 150m. The FPSO is designed to process 30,000 barrels of oil per day, with the ability to store over 600,000 barrels of crude oil.

Current News

Precision Shaft Alignment: A Sustainable Advantage in Modern Engineering

Precision Shaft Alignment: A S

Aquaterra Energy Gets Multi-Year Well Intervention Job off Spain

Aquaterra Energy Gets Multi-Ye

Two DOF Vessels Get Work in North Sea and Australia

Two DOF Vessels Get Work in No

Seatrium Unit Launches Arbitration Against Petrobras over FPSO Contract

Seatrium Unit Launches Arbitra

Subscribe for OE Digital E‑News

 
Offshore Engineer Magazine