Statoil to drill Mim with Deepsea Bergen

Statoil has received consent from Norway’s Petroleum Safety Authority (PSA) to drill exploration well 6507/3-12 on the Mim prospect in the Norwegian Sea.

Statoil is the operator for production licence 159B in block 6507/3 in the Norwegian Sea west of Sandnessjøen.

Water depth at the site is 381m. Drilling is scheduled to begin in early January 2017 and will last 27 days. A possible sidetrack from the well will take a further 18 days. 

The well is to be drilled by the Deepsea Bergen semisubmersible drilling facility owned and operated by Odfjell Drilling. The facility is an Aker H-3 type, built in 1963. It is classified by DNV GL and registered in Norway.

Current News

New York Not Moving Forward With Three Offshore Wind Farms

New York Not Moving Forward Wi

DNV Awards Certificates for Fortescue’s Dual-fueled Ammonia-powered Vessel

DNV Awards Certificates for Fo

Energy Storage on O&G Platforms - A Safety Boost, too?

Energy Storage on O&G Platform

Türkiye Aims to Drill for Oil Off Somali Coast Next Year

Türkiye Aims to Drill for Oil

Subscribe for OE Digital E‑News

Offshore Engineer Magazine