First Steel Cut for Rem Offshore’s Third Vard-Built CSOV

Tuesday, July 8, 2025
(Credit: Vard)

The official steel cutting ceremony for the third commissioning service operation vessel (CSOV) Vard is building for Rem Offshore has been held in Vietnam earlier in July, marking the start of construction for the vessel set for delivery in late 2026.

The first steel for the vessel was cut on July 1 at Vard Vung Tau shipyard in Vietnam.

The vessel NB 983 is the sister vessel to the NB 948 vessel, named REM Wind, that was delivered to REM Offshore in April 2024, which followed the delivery of REM Power vessel a year earlier.

The CSOV is tailored to provide services during the construction, operation, and maintenance of offshore wind farms worldwide. The vessel’s size is 85 m by 19.5 m with cabins for up to 120 people, including 93 wind turbine technicians and a crew of up to 27 people.

It will feature VARD 4 19 design, developed by Vard Design in Ålesund. The vessel will be equipped with a diesel-electric and battery hybrid propulsion system designed for highly flexible and fuel-efficient operation.

Categories: Shipbuilding Vessels Renewable Energy Industry News Activity Offshore Wind CSOV Inspection & Repair & Maintenance Support Vessel Construction Vessel ROV & Dive Support

Related Stories

Construction Starts for World’s First Fully Electric CSOV

Construction Starts for World’s First Fully Electric CSOV

Tidal Transit Holds Belated Christening for CTV Fresh off its Maiden Job

Tidal Transit Holds Belated Christening for CTV Fresh off its Maiden Job

Venture Global to Supply LNG to Italy's Eni Under 20-Year Deal

Venture Global to Supply LNG to Italy's Eni Under 20-Year Deal

Current News

Beacon Offshore Energy Begins Production US at Shenandoah Field

Harlyn Solutions Expands Market Scope with New Dutch Base

PTTEP Acquires Southeast Asia’s Offshore Block from Chevron’s Hess Unit for $450M

Valeura Energy, PTTEP Partner Up on Gulf of Thailand Blocks

Subscribe for OE Digital E‑News

Offshore Engineer Magazine