Morocco to Tender for Floating LNG Terminal

Monday, June 3, 2024

Morocco plans to launch a tender this summer to build a floating liquefied natural gas (LNG) terminal in the northeastern Nador West Med port, the energy ministry's head of oil and gas said on Friday.

The ministry expects to reach financial close in 2025 with construction, commissioning and commercial operations due in 2026, Abdelghafour El Hadjaoui said in a presentation seen by Reuters.

The LNG terminal will be connected to an existing pipeline that helps Morocco import 0.5 billion cubic meters (bcm) of LNG annually from Spanish terminals, enough to power two small electricity production plants.

Morocco also plans to connect the same pipeline to developing gas fields in its east and west. Morocco's natural gas needs are expected to increase to 8 bcm in 2027 from 1 bcm currently, according to ministry estimates.

Nador West Med is a deepwater port under construction with expected capacity of 3.5 million containers.


(Reuters - Reporting by Ahmed Eljechtimi; Editing by David Goodman and Mark Potter)

Categories: LNG Industry News Activity Africa

Related Stories

Azule Energy Makes Significant Oil Discovery Offshore Angola

Jan De Nul’s Fleeming Jenkin CLV to Get Dedicated Training Simulator

QatarEnergy Receives Offshore Exploration License From Libya

Current News

Trump Calls Out California, UK Energy Deal

DOF Group ASA Awarded Contract in Argentina

Jifmar, Seavium Partner to Roll Out AI Across Offshore Fleet

DUG Hooks Multi-Client Seismic Reprocessing Survey off Malaysia

Subscribe for OE Digital E‑News